Saturday, November 2, 2024

The 35kV power grid project has been put into operation and will provide power transmission to support local economic development

KUITUN, China, Oct. 31, 2024 /PRNewswire/ — The temperature measurement of the 35 kV Yuxing line is normal, and no defects or hidden dangers were found during the inspection. On October 30th, staff from State Grid Kuitun Power Supply Company conducted a post transmission inspection of the 35 kV Yuxing line to ensure reliable power supply, meet the requirements of safe power supply, and ensure the safe and reliable transmission of water and electricity, injecting new momentum into economic development. 

It is reported that the project starts from the eighth level hydropower station (Jinyu Hydropower Station) in the Jingou River Basin and ends at the 35 kV Yuanxinggong Substation, with a total length of about 11 kilometers and the construction of 45 new iron towers.

Safe and reliable power supply is an important foundation for economic development and social stability, as well as the mission of power grid enterprises, providing important guarantees for high-quality regional development.

During the construction period, State Grid Kuitun Power Supply Company carefully carried out on-site inspections and construction plan preparation, strengthened the management of large construction machinery, closely monitored key links, strictly adhered to safety bottom line, strengthened quality control, and strict progress control, successfully completed the construction task, effectively improved the power transmission capacity of Shawan City’s transmission section, ensured the transmission of abundant electricity, met the load demand of Xinjiang power grid, improved the stable operation of Xinjiang power grid, and provided reliable guarantee for the economic development and social stability of Xinjiang.

In the next stage, State Grid Kuitun Power Supply Company will coordinate the operation plan, allocate construction forces reasonably, strengthen key link control, promote construction with high efficiency and quality, strictly implement standardized operation requirements, conscientiously implement the "Six Refinements and Four Modernizations" of infrastructure construction, vigorously promote mechanized construction and green construction, strive to overcome various factors such as tight schedule, heavy tasks, and difficult construction, closely monitor the progress of key projects, and ensure the safe construction of various construction projects throughout the year.

 

Source : The 35kV power grid project has been put into operation and will provide power transmission to support local economic development

>

This content was prepared by our news partner, Cision PR Newswire. The opinions and the content published on this page are the author’s own and do not necessarily reflect the views of Siam News Network

Must Read